illustration of inter-trial coherence
Published:
Inter-trial coherence measures phase-synchronization across trials. It is the circular sum of phases at a certain point in time (length of red arrow). It reaches its maximum value of 1 for perfectly phase-aligned signals and becomes 0 as the phase distribution becomes uniform. pic.twitter.com/jv2unSVC7O
— Natalie Schaworonkow (@nschawor) December 17, 2019